BOKAWATER · Specialist series04 / RO membrane elements
BOKAWATERRO membrane elements
RO membrane elements

Work with us

For engineering, distribution and OEM enquiries, start by identifying the project stage and your role. We can then frame a supply discussion around the same technical basis your customer is using. State any brand, documentation, inspection and destination requirements explicitly. Partnership terms, territory and exclusivity require a separate agreement.

What to prepare

  • Feed-water source, salinity, temperature and analysis
  • Required permeate flow, quality and operating hours
  • Existing model, dimensions, connectors and pressure vessel
  • Element quantity, array layout and delivery destination

Make the scope explicit

Ask the proposal to distinguish equipment supply, civil works, external piping, electrical connections, commissioning, training and consumables. Confirm each responsibility in the project quotation. Items discussed on this website are planning considerations, not an automatic inclusion in every supply package.

Final configuration and performance require review of your project data.
Discuss your project ↗

Bring us the conditions. Let’s define the system.

A useful enquiry can start before every parameter is known. Tell us what you know and where engineering input is needed.

Discuss your project